I'm so glad this hidden monorail broke down.
Tom Scott
0:00 Do you want to see a hidden, suspended monorail?
0:03 My road trip brought me to Gloucestershire, and to the River Severn.
0:06 The Severn Estuary has one of the highest tidal ranges in the world,
0:10 15 metres between high and low tide,
0:13 staggering amounts of water flowing in and out every day.
0:16 Crossing it are two bridges: the Severn Bridge,
0:19 from the 1960s, and the Second Severn Crossing,
0:23 completed in 1996 and now officially called the Prince of Wales Bridge.
0:27 That’s the bridge that, these days,
0:29 takes most of the traffic crossing the water between England and Wales.
0:33 And it is a masterpiece, five kilometres long, the outer parts, the approaches,
0:38 are held up on concrete piers 100 metres apart,
0:41 anchored to the rock under the estuary.
0:43 But the inner part of the bridge needs to be wide
0:46 enough and tall enough that large ships can still pass under it,
0:49 so, that is a metal cable-stayed bridge a kilometre long.
0:53 Cable-stayed means, unlike a suspension bridge,
0:56 the bridge deck is held up by the cables
0:58 that are physically connected to the pylons, the two big towers.
1:03 But I wasn’t there to see the bridge itself, at least not at first.
1:06 After a lot of negotiation between my producers and National Highways,
1:10 I was there to see the suspended monorail that’s tucked away underneath it.
1:17 Full disclosure: National Highways did ask
1:19 to check this video before it went out.
1:21 But they’ve had no editorial control beyond my offer to blur stuff if needed.
1:25 I met the folks from National Highways at the maintenance depot
1:28 at what’s called the Avon Abutment on the English side of the bridge.
1:32 It’s a lovely day for it.
1:33 It’s beautiful, yeah, you’ve picked a very good day.
1:36 That is Dan, he’s been part of the team
1:38 working on the bridge since its construction.
1:40 Holding the camera is Liam, who’s from the National Highways media team.
1:44 And who had no idea quite what he was getting himself into that day.
1:48 Because the plan was: take the monorail out to the English pylon.
1:52 and then go up to the top of the bridge.
1:53 That’s not exactly what happened.
1:56 The first thing we saw was the maintenance gantry.
1:58 Currently being decommissioned and replaced.
2:00 That’s how they get people to inspect the outside of the bridge.
2:04 It could rotate around for transport and be moved along
2:06 the bridge on the two blue rails that you can see.
2:09 We were just talking about that old gantry when...
2:11 We’re looking at replacing this...
2:13 (engine starts) So, that’s the RAT...
2:16 That’s the RAT?
2:17 ...starting up.
2:18 We’re about to go out onto the rail in the centre, Tom, that’s the RAT rail.
2:22 -Yeah?
2:23 And RAT stands for Rapid Access Train.
2:25 -Yeah.
2:26 It’s a monorail that the RAT hangs off.
2:29 See the rail just there, and the square holes in the bridge?
2:32 That’s what we’ll be travelling on and through.
2:35 -Okay, so we’ll make our way up?
2:36 -Yeah, lead the way.
2:37 Just to be clear to the audience,
2:39 there has been a long safety briefing before I’ve been allowed up here.
2:42 And every single piece of equipment in the hand is being safely tethered on.
2:49 You have a little railway station up here.
2:51 -It is.
2:52 The RAT is a very rare thing: a suspended monorail.
2:56 It’s on the underside of the road deck, the surface of the bridge.
2:59 And almost none of the tens of thousands of people who travel over
3:03 the Prince of Wales Bridge each day have any idea that it exists.
3:07 Alright.
3:09 Yeah.
3:11 Hit my head again.
3:12 (laughs) There’s no room for your legs.
3:14 I was sitting on a chair but the seat of the chair was just on the floor.
3:18 And of course, what I have to remember is: this is the bottom of the train.
3:22 There’s...there’s very little headroom and there’s very little legroom.
3:25 (clanking, clicking) -Okay, Steve, thank you.
3:28 -Where are you going, Dan?
3:29 Oh, M2, mate, please.
3:30 That was the view that Steve the driver gets.
3:33 It’s quite limited, but given that it’s a monorail,
3:35 that’s probably not a massive problem.
3:37 That big box is the generator for the RAT, and it’s the first of four carriages.
3:41 We were sitting in the second,
3:43 our other driver was sat in the third, for safety.
3:45 And the fourth was a metal cage
3:47 for any equipment that we’d need to bring across.
3:49 We started at the Station Four pier, N48.
3:52 This is very tight clearances here.
3:55 That is maybe two inches?
3:57 -Yeah, yeah.
3:58 And just down there is the tidal mudflats of the Severn.
4:02 We are out over water now.
4:04 Such a tight clearance.
4:05 -It is.
4:06 So, if it’s, for whatever reason,
4:09 really howling winds, unfortunately, we can’t run the RAT.
4:12 Now it is quite protected here, so, the winds have to be really bad.
4:16 So, we have another driver in the back there?
4:18 We do, you’ve always got one driver in each cabin
4:22 and the driver is always facing the direction of travel.
4:26 Presumably in case of emergency?
4:28 There’s...I mean, I know this ’cos I had the long safety briefing,
4:31 but there are so many levels of safety here.
4:35 -Yeah, there has to be, yeah.
4:36 -So, two drivers.
4:37 -Two drivers at all times.
4:39 -Yeah.
4:39 Big thing is, if this was to break down,
4:42 for whatever reason, if we lost power with the diesel generator...
4:45 -Yep.
4:46 -...we’ve got a battery, an auxiliary drive that kicks in.
4:50 I’ve worked on this structure since I was 18 years of age.
4:53 And I’m 50.
4:54 I’m 50!
4:55 So, yeah, I’ve worked here...
4:57 my whole working life has been spent on this structure.
5:00 I worked in construction.
5:02 However, all through construction, which was 1992 to 1996,
5:07 the furthest I ever got out over the water
5:10 was the stitch beams back on the Avon Abutment.
5:12 Oh, right!
5:13 So, it wasn’t until I come onto the maintenance that I
5:16 was lucky enough to see the structure from all sides.
5:20 We passed through another station, which made me realise:
5:23 when you get off at a station, where are you going?
5:26 And who’s going there?
5:27 Because surely there’s nowhere to walk to underneath the bridge?
5:30 Like obvious question, what’s the RAT used for?
5:33 I haven’t even established that yet.
5:35 Not a silly question, it is logistics.
5:38 Getting labour, plant, materiel out onto the bridge.
5:42 You could walk out.
5:44 If you ever come back, Tom, I’ll take you for a walk through the bridge.
5:48 But presumably that’s up on the road deck?
5:50 -No.
5:50 -No?
5:51 -These viaducts are hollow.
5:53 -Oh!
5:54 Inside is a walkway, and you can walk.
5:57 It’s five kilometres.
5:59 But you can go inside the bridge at the Avon abutment
6:02 and you can walk all the way out to the Gwent abutment.
6:05 Let me just show you that shot looking up at the bridge one more time,
6:08 ’cos it’s important: there’s no place to walk along the underside of the bridge.
6:13 You’re either taking the RAT, or that big gantry,
6:16 or you’re walking on the inside of the bridge,
6:18 in the hollow parts, the viaducts, one on the north side, one on the south.
6:23 I really wanted a closer look at that, and I realised,
6:25 as we trundled along in the RAT that I was missing half the story here.
6:29 There are hidden viaducts, and we were speeding right past them.
6:32 And there were expansion joints.
6:34 The metal cable-stayed bridge, out in the centre of the river,
6:37 that’ll expand and contract day-to-day,
6:39 as the sun warms it and the night cools it.
6:41 But the big concrete approaches, where we were then, they have many,
6:45 many times the thermal mass: so, they’ll expand and contract with the seasons.
6:50 And over kilometres of concrete bridge,
6:52 that means there have to be gaps that it can expand into.
6:55 We are going over a movement joint.
6:57 You know you said to me about the expansion joint?
6:58 I was going to say, we’ve slowed down a lot here.
7:00 So, this is one of the ten movement
7:03 joints that allow the bridge to expand and contract.
7:06 That’s such a big gap.
7:08 -Yeah.
7:08 -Wow.
7:09 That’s...
7:13 massive.
7:14 I wanted a better shot of that.
7:16 So, we’re coming up to another station, it looks like?
7:17 Yeah, another RAT station.
7:19 So, the RAT could stop, and people could get out onto the station
7:23 and go into either the north or the south viaducts,
7:26 according to where they’re walking.
7:28 Oh yeah, we’ve got a station on both sides here.
7:30 There’s a road up there.
7:31 -Yeah.
7:31 Why not use the road?
7:33 Because presumably there’s an access between the road
7:35 deck and the internals of the bridge.
7:37 Why bother to put a suspended monorail in?
7:39 We have got a maintenance strip, and we do use it for access.
7:44 The team quite often walk in and out on the maintenance strip.
7:47 By maintenance strip, Dan means just the side of the road,
7:50 with high-speed motorway traffic going past inches away.
7:54 With the best planning in the world, it’s out of our control.
7:57 Items do come off vehicles.
8:00 -Oh.
8:00 Yeah.
8:01 So, we try and not use the maintenance strip.
8:06 It’s not a public right of way, like the Severn Bridge.
8:09 -Right.
8:09 -It’s not a public right of way.
8:11 (engine stops, beeping) -Turn it off and on again?
8:14 -I think so.
8:14 (laughs) So, as I said,
8:17 this RAT has just undergone 18 months of totally being stripped down.
8:22 -I’m riding a brand new refurbished RAT.
8:24 -You are.
8:25 (beeping) There we go.
8:25 As I said to you, I’m really excited.
8:27 It’s the first time in 18 months that I’ve been on it.
8:29 The RAT actually had a bit of a troubled history:
8:31 shortly after the bridge opened, engineers found cracks in the monorail,
8:35 and it was decommissioned for a few years before
8:37 everything was repaired and resurrected in the early 2000s,
8:39 because it is very useful.
8:42 Long-time viewers of this channel will know
8:44 that I have quite a history with monorails.
8:47 I actually think they’re terrible in almost all circumstances,
8:50 particularly for public transit,
8:52 but in this case: it seems like it’s a good option.
8:54 But alas, that day, luck was not with the newly refurbished RAT.
8:59 And the next few moments seemed terrible at the time,
9:03 but in hindsight, they were the best thing to happen to this video.
9:06 Other than, of course, getting it sponsored.
9:08 I really do use NordVPN all the time.
9:12 This ad’s a little different, though.
9:13 They asked me to talk about their next-gen antivirus,
9:16 and I didn’t understand what that was, so...
9:19 I asked them.
9:20 We have our own phishing detection models, scam detection models,
9:24 fake-shop detection models, to detect if something is malicious.
9:27 Scams, calls, dark web, banking checks, etc.
9:31 So they'll block malware and phishing sites
9:33 and scams before they reach your device, not after they’ve been downloaded.
9:37 And they’ll alert you if they find
9:39 leaked or stolen credentials that match yours.
9:41 I talked to them for a long time about technical stuff and privacy,
9:45 and they’ve convinced me they know what they’re doing.
9:48 It’s always designed around that: we don’t know who is the user.
9:52 We don’t know name, addr— we don’t know nothing!
9:54 They’ve got independent tests backing up that it works.
9:57 And the VPN’s still there!
9:58 When I’m travelling, it stops websites sending me to local translated versions,
10:02 it lets me access sites that block certain countries,
10:05 and I’ve saved hundreds of dollars on car rentals by clicking NordVPN’s
10:08 magic button to make it look like I’m back in the UK.
10:11 Same car, same details, lower price.
10:14 NordVPN works across Windows, Mac, Linux, iOS and Android,
10:17 on up to ten devices at the same time,
10:19 and there’s a 30-day money-back guarantee if you want to test it out.
10:22 Go to nordvpn.com/tomscott scan the QR code on screen or click the link
10:27 in the description and you’ll get the best deal they’re currently offering.
10:30 As I was saying: the RAT was...
10:32 not having a good day.
10:35 (rumbling, beeping) (engine stops) This might be a good time,
10:40 and I realise it’s not gonna happen, that we...
10:42 we were talking about rescue procedures.
10:44 So, there would be a backup electric generator.
10:48 That’s your auxiliary drive, yeah,
10:49 that these guys can basically turn the diesel generator off.
10:54 You might even witness it in a moment.
10:55 -Oh, okay.
10:56 And move using the...it’s a battery, but we call it the auxiliary drive.
11:00 It’s very slow, however, very powerful.
11:03 Right.
11:04 Oh, just huge amounts of torque?
11:06 -Yeah.
11:07 So, all you would do is get to the nearest
11:11 RAT station and then obviously you can get people off.
11:13 You might have to walk in or out.
11:15 (beeping) So, was that beep an acknowledgement
11:17 from the other driver there that all’s good?
11:19 -Just the radio.
11:20 -Just the radio, okay.
11:21 There is another way of getting people out using RA1,
11:25 which is a minibus and a backup vehicle.
11:27 -Yep.
11:27 -We don’t like doing it.
11:29 -No.
11:29 Because you’ve got people in...
11:30 next to live traffic.
11:31 Yeah, 100%.
11:33 (to radio) Neptune Kilo, Kilo Neptune India.
11:39 (bleeping) So, auxiliary drive...
11:41 -(radio) Go ahead, Steve.
11:42 (bleeping) Yeah, you take over.
11:44 You take us back to the last station.
11:47 So, what they’re doing now, you don’t really appreciate here,
11:50 but the bridge is on an angle.
11:53 Yep.
11:53 So, the reason we’re gonna go back that way,
11:55 and that’s why there’s two drivers, we’re gonna use gravity to help us go back.
11:59 Right.
12:00 Breakdowns happen.
12:01 Ideally not when someone’s got two cameras on you and your monorail,
12:04 but they can deal with this.
12:06 Plan A...
12:07 well, actually Plan B, I guess, we were already on Plan B,
12:11 that was to use the generator again, but go in the other direction.
12:14 Back in the day when this first came out and had one cabin,
12:18 honestly, I’m not making this up,
12:20 there was a little wheel under the seat and a pole and you
12:25 had to put it in a slot on the generator and turn this wheel.
12:28 -Right.
12:28 -It worked.
12:29 -To crank it?
12:29 -To turn it, just to get back to...
12:31 but it took forever.
12:33 It took forever and you’d have to take it in turns as the people in there.
12:36 We got rid of that.
12:37 The generator still kept causing trouble, and while the drivers kept trying,
12:41 it was clear we were going to Plan C: the battery backup.
12:44 Which did work, which is great, we very slowly moved on, but I will admit
12:49 to a slight disappointment that we didn’t end up using Plan D.
12:53 We’ve got permanent roped access on the bridge.
12:55 A lot of our inspectors, not all of them,
12:57 but a lot of them are roped access trained.
12:59 This is folks who can abseil?
13:01 This is folks that can abseil, industrial abseil, and folks that, if need be...
13:05 (bleeping) ...and in 30 years we’ve only ever done it once,
13:11 can climb out...to the RAT, actually get to us, and...
13:18 So, they’d send a rescue boat out and we’d have to abseil down?
13:21 We would.
13:22 (engine stops, beeping) Generator’s off, that’s the auxiliary drive.
13:28 Oh, so we’re actually on the auxiliary now.
13:30 Yeah.
13:33 Well, sorry to have a technical problem when we’re filming.
13:34 -I know!
13:35 -(laughs) The electrical team will have to walk out from the station.
13:39 So, we’ve got a decision now.
13:42 I think we are probably better off,
13:45 rather than waiting for the electrical team to come out,
13:48 and it could take an hour to diagnose.
13:50 I think we should go into the structure...
13:52 -Yeah.
13:53 -...which wasn’t planned but is very interesting, and walk to the cable-stay.
13:56 Absolutely, yeah.
13:58 100%.
13:58 Like, thank you.
13:59 -Yeah.
14:00 That’s a whole section I didn’t expect to get in this video, so, thank you.
14:04 This was meant to be a little video about a monorail...
14:07 and all of a sudden, that’s become a lot more.
14:08 Thank you.
14:09 My thanks in particular to Liam behind the camera,
14:11 who again is from the media team, and kept smiling despite,
14:15 I assume, being somewhat frustrated that filming wasn’t going to plan,
14:19 and that the RAT wasn’t behaving.
14:20 What you won’t be privy to is all the cussing back there.
14:24 Now the electrical department’s got to walk all
14:25 the way through the viaduct carrying their kit.
14:27 -Oh, they have!
14:27 Which pier are we on?
14:29 We started at N48.
14:30 No, luckily, we’re about halfway out.
14:34 -Okay.
14:34 -So, we have got a walk inside.
14:36 Yeah.
14:38 I keep hitting my head on this.
14:41 So, what do they say in the media world?
14:44 Never work, was it, with children and animals?
14:46 Children and animals, yep.
14:47 So, technically, well, this is a RAT, rapid access train, so there you are.
14:51 Okay, thank you, Steve.
14:52 -Thank you very much!
14:53 -Sorry about that.
14:54 -No problem.
14:55 It’s not your fault!
14:57 -Thank you for getting us back.
14:58 -Right?
14:58 I’ll tell you what wasn’t on the schedule.
15:01 Stopping at this pier and seeing that view.
15:04 Good heavens!
15:06 Blimey.
15:07 Alright.
15:08 Let me get my GoPro back out of there and I guess we’re going for a walk.
15:11 -We’re going for a walk.
15:13 -Right.
15:15 (gasps) I’m glad someone’s made a padded surface here, that’s nice.
15:21 (laughs) Oh, wow.
15:25 So, welcome to Avon Viaduct North!
15:27 The structure’s five kilometres long,
15:30 and we’ve got 48 piers plus the abutments, so, 50.
15:34 So, now we walk that way.
15:37 -We walk that way, yep.
15:39 -For quite a while.
15:40 And what you’ve got to remember to do is...
15:44 -Oh!
15:44 -Turn the lights out as you go.
15:46 -Alright.
15:46 -Let’s go.
15:47 Let’s go.
15:48 Let’s walk inside a bridge.
15:50 We’re still out on the concrete section there.
15:52 The cables you can see are internal post-tensioning: during construction,
15:56 those cables were passed through ducts
15:58 in each hundred-metre section of the bridge,
16:00 stretched, and then while they were stretched,
16:02 anchored into the structure at both ends.
16:05 Because they want to return to their original length,
16:07 that pull puts the entire concrete structure under permanent compression.
16:11 And concrete is strong in compression, but weak in tension, so,
16:15 it’s like having someone permanently squeezing
16:17 to hold everything together and keep it strong.
16:20 -What you’re about to get to now...
16:22 -That sounds like an expansion joint.
16:23 It’s one of the movement joints, yeah.
16:25 So, that huge gap that we saw earlier that I pointed out from the RAT,
16:29 we’re about to cross this?
16:30 -Yeah.
16:31 -Wow!
16:32 Okay, down is the River Severn.
16:37 Forward...
16:39 thanks to Liam who’s holding the camera there...
16:42 and backwards is the bridge.
16:45 (loud trundling) And that is the expansion joint.
16:50 A hell of a lot more close up than I thought I’d ever get to see it.
16:53 Yep.
16:56 Okay, well, I’m gonna keep going.
16:59 I didn’t expect to see that close up.
17:01 Thank you very much.
17:02 This is really good actually, because normally, you know,
17:06 you go out on the RAT or you get RA1 out,
17:08 and everyone wants to see the cable-stayed bridge but this, this is the truth.
17:13 This is what our guys have to walk, day in day out, most of the time.
17:17 Right!
17:18 Oh yeah, everyone wants to see the pretty bits,
17:20 but the repetitive concrete structure here, with...
17:27 no clue of where we are or how deep we are.
17:30 Do you know what?
17:30 I’ve worked here, like I say, my whole life.
17:33 If you were to bring me in one of these viaducts, spin me round,
17:39 the only real way I’d know if I was heading to England or to Wales,
17:43 the cable-stayed bridge, is the markings on the wall.
17:48 So, this tells me, remember I said everything numbered from Wales to England?
17:52 -We started at N48.
17:54 -Yeah.
17:54 So, this just lets me know I’m in the North Viaduct.
18:00 I am closer to Pier 35 than I am to Pier 36.
18:06 35, 36 and 05 is...?
18:09 And 05, I’m the fifth segment from Pier 36.
18:15 Oh, so when you say segment, that’s...’cos this is 04 over here.
18:19 -Yeah.
18:20 -So, this is the connection between the segments just here.
18:22 -Yeah.
18:22 If you look from a drone shot on the outside,
18:24 you can see the lines where each segment ends.
18:27 The same ones that we’re seeing from the inside as we walk over them.
18:31 So, these were precast either on the English side or the Welsh side.
18:35 Primarily most of it was done on the English side, although not all of it.
18:39 And yeah, this...
18:40 -That’s the joint.
18:42 This just there.
18:42 -This would be, yeah.
18:43 This would be brought out,
18:45 dropped into place, literally glued, and through here,
18:50 something called a Macalloy bar that, obviously,
18:52 you can’t see now, but it’s a steel bar,
18:56 like 50mm diameter, and it would be bolted, four segments,
19:00 and that would support it until X amount
19:03 of segments were in, and the post-tensioning can go through.
19:07 So, it’s just build it out, build it out,
19:09 get to the next pier, build it out, build it out, build it out.
19:12 -Yeah.
19:12 And I haven’t yet figured out a pattern, if that makes sense.
19:16 Every single time we go to a new section,
19:20 I’m surprised by the gradient, or what it’s doing.
19:22 When you get to 29, it’s the transition.
19:25 We leave the concrete.
19:27 And then we go on the cable-stayed bridge.
19:29 -Yep.
19:30 -Which is a kilometre of steelwork, then.
19:34 It’s getting dark up ahead.
19:36 That’s just a deep black hole.
19:38 You forget, you’re down here with the lights on.
19:41 -Yeah.
19:42 -And it feels normal.
19:43 -Yeah.
19:44 This should be pitch black.
19:46 We are completely encased.
19:48 So...
19:50 -Alright.
19:51 Onwards.
19:52 -Okay.
19:52 You can just see, if you’ll pardon the pun...
19:54 -I can just see!
19:54 You can just see light at the end of the tunnel.
19:56 There’s light at the end of the tunnel there.
19:58 Okay, so this is the transition...
20:00 -Oh, yeah, okay.
20:01 -...from concrete to steel.
20:03 So again, watch your head.
20:04 -Mind my head.
20:05 Yep.
20:06 -As Liam...Liam rightly pointed out.
20:08 -Every time!
20:09 Yeah.
20:10 I personally don’t think anyone over 5′7″
20:14 should be employed to work on this structure.
20:16 It’s too much of a safety risk.
20:18 -(laughs) We reached the end of the concrete part of the crossing.
20:21 Now, it was out over the channel in the middle, onto the cable-stayed bridge.
20:26 There was another movement joint to let the two parts expand and contract,
20:29 and it was incredibly loud there...
20:31 -Above your head there...
20:32 -Yep.
20:33 ...the reason it’s so loud, that is called a bridging plate.
20:37 -Right.
20:38 -It is solid steel, about 100mm deep, wrapped in rubber,
20:45 and some car tyres are on top of that plate.
20:50 -Right.
20:50 -The live traffic is running over that.
20:52 Ten centimetres of rubber-wrapped steel between us and the car tyres.
20:57 No more concrete structure:
20:58 we headed out on the metal catwalks under the cable-stayed bridge.
21:02 So, we are literally just above the Severn Estuary here.
21:06 We are, indeed, yeah.
21:07 I hope the camera is getting the scale of this.
21:13 So, the RAT would pass through the big ol’ hole next to where we were.
21:17 -The walkway, yeah.
21:18 -And just head out under there.
21:21 So, I casually walked out on the catwalk,
21:24 with just the metal grating and about 50
21:26 metres of air between me and the Severn Estuary.
21:29 The tide had mostly gone out by this point,
21:31 so, it was just mud and rocks down there.
21:33 We had a couple of hundred metres of catwalks to get across.
21:36 I know for a huge number of people this is their job.
21:39 This is not remarkable.
21:41 This is just where they have to come out day after
21:44 day after day in wind and cold and sleet and snow.
21:52 But for an average civilian...
21:54 (laughs) ...thank you so much to everyone.
21:58 Three points of contact.
22:00 There’s a very weird effect here where, if I look down,
22:04 if I show you the view down here...
22:07 my brain refuses to accept how far away that is.
22:10 I keep thinking that it’s an optical illusion.
22:13 We are so high up and that is so massive that it’s
22:17 not the size of structure that the brain’s designed to deal with.
22:23 Alright.
22:23 This is M2 pylon?
22:26 This is M2 pylon, yeah.
22:28 Woo!
22:29 Wow.
22:30 So, the RAT would...
22:31 well, we’re under the RAT rail.
22:32 -We are.
22:33 -If the RAT was running right now, we would not be allowed to be here.
22:36 -No, these chains would be across.
22:37 And when the RAT parks here, this is where you embark, straight down the steps.
22:42 The last things to do, then: get to the bottom and the top of the pylon.
22:46 -Right, so shall we head down?
22:48 -Yeah.
22:49 Bag coming down.
22:51 It’s quite heavy, watch out.
22:53 You’ve got it.
22:54 We set down most of our bags in the welfare,
22:56 the little rest area in the middle of the pylon.
22:58 And if you need a cup of tea, you can make a cup of tea.
23:00 The next bit was gonna involve some very cramped spaces, so,
23:03 I switched to my 360 camera, and we headed to the elevator.
23:06 Oh, that is a long way down.
23:08 So, we’re going down first?
23:10 We’re gonna start at the bottom, at caisson level, and work our way up.
23:14 So, these are quite rickety lifts.
23:17 They’re called rack-and-pinion lifts.
23:19 And they are the lifts from construction.
23:23 -Right.
23:23 -As the pylon went up, they were put in.
23:26 So, they’re very basic.
23:28 You’ll be pleased to know on this occasion, Liam,
23:31 if these break down, it’s purely gravity-fed to the next lift.
23:35 -(laughter) And there is ladders, landings, from top to bottom.
23:40 Right.
23:40 It is spectacular, the view at the pylon top,
23:43 but this view, from an engineering perspective, for me, is The View.
23:49 This is what I actually get excited when I show people,
23:52 ’cos no one really wants to see this as much as the top.
23:59 Okay.
24:00 Oh, wow.
24:02 So, just get your bearings a moment.
24:05 We are on...
24:07 this pylon is the English one.
24:10 That one is the Welsh, that’s M1.
24:12 Oh, so, the border is just here?
24:14 Yeah.
24:14 Above our heads there is the walkway that we walked in on.
24:17 (laughs) You can also see the other gantry there,
24:20 hanging underneath the road deck.
24:21 Dan’s right: from an engineering perspective, this was the most impressive view,
24:26 ’cos you can see all the details of the bridge.
24:28 So, how high up will we be?
24:30 Above the seabed, about 150 metres, 155 metres.
24:34 I never let my colleagues forget on the Severn
24:37 Bridge that we’re a couple of metres higher.
24:40 -(laughs) It’s very minimal but...
24:42 -But it counts.
24:43 -It counts.
24:44 Alright, if you just wait there a minute, guys, I will get us...
24:49 I will get us some light on the subject.
24:53 I can’t see a thing, I’m glad you know where you’re going.
24:56 (clanking, creaking) -We’re all good?
25:01 -Yeah, all good.
25:01 If you come on up.
25:03 -Alright.
25:03 Okay, if you want to, you can use that there.
25:07 -Yep.
25:08 -This will move only slightly.
25:10 It won’t come down, okay?
25:11 -Okay.
25:13 -That’s it.
25:13 Keep coming up.
25:14 -Yep.
25:15 (motorbike roaring) (gasps) Okay, so get your bearings.
25:23 Oh, wow!
25:26 England.
25:27 Severn Bridge.
25:29 Wales.
25:30 Sometimes it’s really difficult to keep my profanity PG-rated...
25:35 -Yeah.
25:35 -...when I’m somewhere like this.
25:38 Yeah.
25:39 I can honestly say it never gets boring.
25:41 The wind!
25:41 There’s wind on this side.
25:43 -Yeah.
25:43 -And the whole structure...
25:45 -Moves.
25:45 -...is just moving a little bit.
25:46 It’s got to bend, because if it doesn’t it’ll break.
25:48 And the cables come in, well, we can see them over that side, can’t we?
25:51 Yeah, well, you can...
25:53 you can see them there.
25:55 -Oh.
25:55 That’s the first time I’ve had a moment where I’m afraid of heights up here.
26:01 Thank you so, so much, sir.
26:03 -Pleasure.
26:03 -Absolute pleasure.
26:04 And Liam, thank you.
26:05 I know you didn’t expect half of this today, let alone holding the camera.
26:08 I’m just glad we had a media guy here, ’cos I would have been,
26:12 “Oh, I’m not sure about this.” -This was not the plan.
26:15 -No.
26:15 Thank you to both of you.
26:17 That is incredible.
26:18 Well, thank you for persevering with it.
26:20 Many wouldn’t have.
26:22 How do we get back?
26:24 (laughs) -That’s a good point.
26:25 -(laughs) Let’s see what I can do.
26:27 (radio bleeps) Neptune Alpha, Neptune Alpha, National Highways, over.
26:33 In the end, we did take RA1, the minibus.
26:35 But you’ll notice there’s another van behind it,
26:38 tucked away into the tiny maintenance strip
26:40 to the left of lane one: and that’s because,
26:42 if someone loses control on the motorway,
26:45 they’re probably going to hit the crumple zone
26:47 at the back of that van first, before they hit us.
26:50 It is risky to be that close to the traffic.
26:53 And I feel like that point wouldn’t have been made nearly as well,
26:56 and this whole video wouldn’t have been nearly as good,
26:59 if the RAT had just taken us out and back.
27:03 Next time, or right now on Nebula, I’m joined by astrophysicist, Dr Becky,
27:08 for something far more down to earth, as two nerds pile up some rocks.